DALLAS ISD - ORG 073 HENRY W LONGFELLOW ACADEMY - NEW CONTRUCTION.
Status
Bidding Closed
Prebid Date | 11/7/22 2:30pm |
Bid Date | 12/6/22 2:00pm |
Company & Contacts
Location
Dallas, Texas
All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
SCOPE OF WORK:
Henry W Longfellow Career and Exploration Academy is a new construction replacement
school on the existing campus of the same name. The project features a new facility with a 3-story academic portion, various CTE programs, administration, fine arts, theater, library,
cafeteria with kitchen, physical education, tornado shelter and various site improvements.
Demolition and abatement of the existing facility is also included in the scope and work will be phased to allow continued operation of existing facility during construction.
BUDGET:
$ 54,285,150.00
PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 02:30 PM on Monday, November 07, 2022, at HENRY W
LONGFELLOW ACADEMY (5314 Boaz St, Dallas, TX 75209) for all interested parties. This meeting is not
mandatory, but information discussed will be extremely helpful in preparation of the proposal.
BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, December 06, 2022, at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Wednesday, December 07, 2022, at 3:00 PM (local time).
Any materials received after the respective closing dates / times will not be considered.
OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231
OWNER’S PROJECT MANAGER (PM)
JACOBS will be the Owner’s Project Manager (PM) for the management of planning, design, permitting, construction, and post-construction for this CSP. All correspondence and communication during the contract finalization, construction and post-construction processes shall be directed to the
Architect/Engineer firm (A/E) with copy to JACOBS. During construction, the PM shall have authority to
act on behalf of Dallas ISD for Owner related direction.
DAVID CASTANEDA, Project Manager, JACOBS
Dallas Independent School District Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 832-228-4748
E-mail: C94294@Dallasisd.org
**ARCHITECT/ENGINEER FIRM (A/E) **
HUCKABEE & ASSOCIATES, INC
Kenneth W. Meyer
801 Cherry Street
Suite 500
Fort Worth, TX 76102
T: 817.377.2969
BID METHOD:
Competitive Sealed Proposals