DALLAS ISD - ORG 385 - MONTESSORI ACADEMY AT ONESIMO HERNANDEZ - RENOVATION.
The scope of this portion of the renovation will include a new secure vestibule with an 81 square foot addition that will connect the existing vestibule to the existing reception area.
SPECIFICATIONS
(click to expand/collapse)
Name | Size | |||
COVER - TOC VOLUME 1 | 841.1 KB | |||
COVER - TOC VOLUME 2 | 719.2 KB | |||
DIVISION 00 | 6.7 MB | |||
DIVISION 01 | 1.7 MB | |||
DIVISION 02 | 4.1 MB | |||
DIVISION 03 | 371.3 KB | |||
DIVISION 04 | 240.9 KB | |||
DIVISION 06 | 266.7 KB | |||
DIVISION 07 | 925.1 KB | |||
DIVISION 08 | 427.1 KB | |||
DIVISION 09 | 550.9 KB | |||
DIVISION 21 | 1.2 MB | |||
DIVISION 26 | 1.4 MB | |||
DIVISION 28 | 271.6 KB | |||
DIVISION 31 | 452.3 KB | |||
DIVISION 32 | 132.1 KB | |||
DIVISION 33 | 67.7 KB | |||
DIVSION 05 | 499.1 KB | |||
DIVSION 23 | 1.5 MB |